With neatly furnished buildings
semi-finished frame is assembled for cement casting into a wooden frame that is arranged,ditch excavation that makes water flow for local residents, drainage water flow is very important for the role of the wider community that makes the water flow to a farm. the collection of heavy equipment was lowered for this one project work to work on a very large project, with extraordinary professional work which would certainly accelerate the manufacture and the project would be completed at the planned tim.
with the journey we took together and the story we brought was some experiences in traveling with comrades and friends, with various jokes and laughter with complaints that we felt would disappear instantly