You are viewing a single comment's thread from:

RE: How to contribute to a future period/window in the EOSCrowdsale using MyEtherWallet (MEW)

in #eos7 years ago

@sandwich Thanks for the awesome guide ! I have 1 question though regarding instruction number 7.

"In the field 'day' put the number you decided on earlier that represents the future window you would like to contribute to"

Period/Window 0 is day 1 till 5 or Period/Window 0 is considered as day 0 or day 1?

For example, if I want to contribute to Window 30, shoud I insert day 30 (same number as Window 30), day 31 (Window 0 considered as 1 day)or day 35(Window 0 has 5 days)?

Sort:  

Sorry for the late reply, Period/Window 0 is days 1-5. Unfortunately, they titled this field "days" which is a misnomer in this context. There's a few of those in this contract.

Thank you for the reply. I hope someone can change the field to 'Period/Window' to avoid confusion and wrong contribution to the intended window. Anyway, thanks again!