President Joko Widodo Inaugurates GBK Stadium
Minister of Public Works and People's Housing (PUPR) Basuki Hadimuljono admitted to being amazed by the results.
There are 600 lights that crowded the GBK stadium. Standard football field is already FIFA classmates.
In addition, each seat can withstand loads up to 250 kg.
Following the FIFA standard, the seats are not easily withdrawn so as to withstand the action of vandalism.
"Already follow the FIFA standards in the security aspects where in an emergency, within 15 minutes, the stadium should be empty," said Minister Basuki a few days ago.
Basuki explained the replacement of the type of chair is better because it can increase the capacity. Currently there are already 80,000 seats installed inside the GBK stadium.
Basuki added better field quality. This is proven by Basuki from the grass that is used is the best grass type zoysia matrella equipped with automatic lawn sprinklers to the zero run-off drainage system.
"The grass quality of GBK Stadium has also been certified internationally, and if imitation grass is used in ABC Field for training or heating, then the best imitation of grass quality," he explained.
PT Adhi Karya (Persero) Tbk and PT Penta Joint Operation Engineering (KSO) with a contract value of Rp 769.7 billion for GBK stadium renovation.
Meanwhile, construction management consultant is PT Deta Decon and PT Multi Karadiguna KSO Services with contract value Rp 10,2 billion.
Overall for the venue renovation and GBK area structuring done by the Ministry of PUPR progress has reached 99 percent.
Although some sports venues have been completed, the GBK area structuring work begun in May 2017 is still in final settlement.