ULOG #006: Last Day of the Working Week! TGIF!
Hello steemit world! Last day for this week and we are still here in the operations department. Just a quick overview of my day in the site.
First off, these are workers laying bentonite strips. These strips are used for concealing holes so concrete mixture will not spill through some holes of the formworks
Next picture is the elbow joint of the pumpcrete. Just a zoom out view of the pumpcrete that i mentioned in my last post.
After roaming the perimeter, we checked for the number of rebars because the area was scheduled for concrete pouring for today.
And a little picture taking with the gang
Then we headed to the roof deck of tower 1. The view was amazing. This is the view of SM Clark from the 9th floor.
This is the view of the site from the roof deck! Featuring an airplane haha
A view of the crane from the roof deck
A view of the crane with the moon
And a selfie of me #EngineerDeSilva
After that, we headed to the office and the last day for week 1 is over. TGIF!
Thank you for reading!